Monday, September 16, 2013

The Making of The Wallagio 2.0: Week 7 and 8

My personal laptop got packed away while, so I have been unable to process pictures.  But I have been taking them throughout.  Rather than dump a bunch of pics, I’ll list them out by day and what happened that day.

Sept 8



Baseboards installed.


Oven installed.  The kitchen is now fully functional.




Sept 9


More progress on my new bedroom.


Spare bath getting demoed.



Zoe loves the new floors.


Even more progress with the new bedroom.


Spare bedrooms floors ripped up.


More progress on spare bath.

Sept 11


Bedroom is practically ready for me to move in.

Sept 13


Backsplash, floor tile and cabinet hardware installed.

Sept 14


Tile in the spare bath finished.


Bedroom finished and being lived in.


Thursday, September 5, 2013

Support Our Green Mountain Gingers

Even if you bought tickets to her concert in Cologne and thought it was for the Tuesday after you got back from Italy and not that Sunday you got back from Italy that even if you did remember she was a 15 minute train ride away you were way too tired to even think about going.

Wednesday, September 4, 2013

The Making of The Wallagio 2.0: Week 6.5


Things have picked up quite a bit since the last update.  So I thought I would post a midweek update.

The old kitchen has been demolished.


That wall is about to disappear.


Au revoir ugly wallpaper.


Not only is that wall gone, but the skylights are gone!!!


And you can’t even tell they were ever there!!