Ceilings painted in kitchen and new living area.
Whoa!! THE CABINETS ARE HERE!!!! How are they all going to fit in my kitchen?
One of the cabinets out of the box.
The inside.
The wall has finally been completely demoed.
Ceilings painted in kitchen and new living area.
Whoa!! THE CABINETS ARE HERE!!!! How are they all going to fit in my kitchen?
One of the cabinets out of the box.
The inside.
The wall has finally been completely demoed.
Not a whole lot of visual changes the past few days, so I’ve skipped some updates. But things are finally starting to look like the end product.
The old windows are gone in the kitchen.
New plumbing and electrical has been covered in drywall.
The bar is looking like a bar.
The other side of the bar.
The old windows from the outside.
Mud put on living room drywall.
Holes in the kitchen wall dry walled and mudded.
Plumbing and electrical work in the kitchen.
The bar is starting to form.
The current state of the powder room.
And the utility room.
The living room closet is finally gone and dry walling completed. So now there’s an extra 20-25 sqft in the old living room.
The view from the new master bedroom.
More light switches being raised. I’m gonna miss that wallpaper.
I haven’t done a whole lot of dusting in the last 20 days.
Not much progress in the garage.
Old windows boarded up and a new window is made.
The plumbing has mostly been moved. The “island” can finally be built.
The storage room in the back of the garage for lawn equipment and whatnot.
I can’t nap with all this banging.
Can you please ask them to stop?
Are you listening to me??
Oh, never mind.
Drywalling almost finished in garage.
Utility room drywalled.
Powderoom drywalled.
Whoa! Light switches at normal height!
Only half of the hardwood going on the floors.
Lots of progress today.
Openings into the garage and kitchen were created.
Bedroom framing completed.
Painting of the front of the house is complete.
Up close look at the two colors. Not to worry. That door is going away too.
French doors added to the garage.
Back of the house painting.
Outside look of the new doors.
Cementing of the former water heater closet.
Lots of trash hauled off.
Even more trash got hauled off.
First round of outside paint. This time just the wood and trim.
Things are moving fast now.
Living room/dining room closet drywall now completely removed.
Door from garage to backyard closed up.
Framing done in garage creating a powder room (right), utility room (middle) and storage room (left).
Demo of wall between kitchen and garage started.
Garage door removed and replaced with a new wall.
Still South Dakota. Found a cute campground that most of the year is a hopping family holiday retreat. But it’s cold and snowy and latish Oc...